A new smoke fan was designed and delivered for the steam boiler at the Kolín Power Plant to increase the maximum output of the boiler to 130 t/h. The delivery included documentation, dismantling of the original equipment and installation of the new fan with frequency converter, modification of the piping, compensator, foundation, connection to the control system, testing and commissioning.