Reconstruction of the fluidised bed boiler at the waste incineration plant

Client

Duslo, a.s.

Year of realisation

2009

Place of realisation

Šala, Slovakia

Within the reconstruction of the boiler of the fluidised bed furnace at the waste incineration plant, the original boiler was dismantled and replaced with a new boiler. The boiler was designed to allow continuous cleaning of the heat transfer surfaces by steam blowers. The equipment was implemented into the existing substation and control system and commissioned.