As part of the reconstruction of the combustion air supply to the heating boilers, technological equipment was designed and delivered for extraction of air polluted with petrol vapours from the production areas, its transport through a pipe network and subsequent use as combustion air for the boilers. The delivery was turnkey and included the provision of all engineering and contracting activities and services, including commissioning.