The reconstruction of selected parts of the coal boiler filter equipment included the manufacture, delivery and overhaul of the main apparatus - filter, valves, steam heater, reverse fan, piping and fittings.
The delivery was carried out on a turnkey basis and included pre-project preparation, revisions, design and operational documentation, dismantling and assembly works, testing, supervision, operator training, commissioning and documentation of the actual condition.