Project documentation for the building permit for the construction of a WtE unit with a total capacity of 20 kt/year was prepared for the heating plant in Cheb. The proposed WtE unit was designed as a pair of lines for the treatment of mixed municipal waste with connection to the central heat supply system via a heat pipe connecting the WtE unit to the boiler house.