For the underground natural gas storage tank of MND a.s. a technical solution was designed and delivered to increase the capacity of natural gas heating. The existing burner was supplemented with a hot-water boiler, which solved the requirement of supplying the necessary heat of natural gas before expansion in a simple way and with minimum requirements for regulation and operation. The delivery included complete documentation, installation, supervision, testing and commissioning.