Hospital waste incinerator

Client

Fakultní nemocnice Hradec Králové

Year of realisation

2017

Place of realisation

Hradec Králové

As part of the modernisation of the waste incinerator, the existing technological equipment of the incinerator was completely replaced. Thanks to the complete reconstruction, the processing capacity was increased to 350 kg/h, continuous operation was ensured and the incinerator was equipped with a modern fully dry flue gas cleaning system. The thermal energy obtained from the incineration of waste is used to produce steam supplied to the hospital premises.

The reconstruction took place on the premises of the Hradec Králové University Hospital and included design and engineering work, construction work, delivery, installation of technology and commissioning.

For more information about our solutions, please contact
Ing. Martin Krňávek
Contact
No items found.