The feasibility study was focused on the project of modernisation of the hospital waste incinerator in the Uherské Hradiště Hospital with the aim of increasing the processing capacity to 1000 t/year and using the heat for hot water preparation and heating of the hospital buildings. The study included a legislative framework and a description of the complete technological solution, material and energy balance, economic and cost analysis and project timetable.