Engineering of the NOx reduction project in the heating plant

Client

AmpluServis, a.s.

Year of realisation

2015

Place of realisation

Stonava

For the project of primary and secondary NOx reduction measures on coal-fired boilers in Teplárna Karviná, complete implementation documentation was prepared and the services of a general designer were provided. Within the framework of the implementation documentation, construction, mechanical and electrical parts were developed. The engineering part included the preparation of the contractor documentation, i.e. the technology commissioning project, individual tests and comprehensive testing, guarantee tests and measurements, as well as the documentation of the actual condition, the operating regulations and the training programme. Algorithm descriptions and specifications for common repairs, breakdowns, spare parts and consumables were also developed.

For more information about our solutions, please contact
Ing. Tomáš Krejčí
Contact