The project involved the installation of new technological equipment for extraction of petrol vapours in the air from production areas. The existing piping network was extended and supplemented so that the combustion air could be used as combustion air in the existing fluidised bed boilers. The equipment included ductwork, fittings, ductwork accessories and a fan.
The turnkey delivery included complete engineering, manufacturing and supply of apparatus and accessories and related services including author's supervision, testing, operator training and commissioning.