As part of the turnkey delivery, 3 low-emission gas burners including gas and air lines were delivered for the RDH furnace. The original burners were dismantled and replaced with new ones. At the same time, the original control system was relocated and modified. The scope of supply included detailed design documentation, equipment testing, documentation of the actual condition and commissioning.