The technology of WtE unit Liberec was modernized by replacing the steam preheater of combustion air. The preheater was designed and manufactured according to the customer's specifications. The original equipment, including air duct, piping and supports, was dismantled and replaced with a new one.
The engineering included the preparation of operational and technical documentation, operator training documents, operating regulations and documentation of the actual condition.