In the incineration plant operation, the original burner systems in the floor furnace and secondary combustion chamber were replaced with natural gas burners and a combined slop oil burner. In addition to the burner systems, a natural gas control station and a slop oil pumping station were designed and installed to break up contaminants and dispense slop oil into the combination burner.
The turnkey implementation included the supply of equipment and design work, as well as the preparation of all stages of project documentation, ensuring the necessary decisions and permits, supervision and documentation for operation and maintenance.