Basic design of the project for the extension of the sludge end of the WWTP

Client

CHEVAK Cheb, a.s.

Year of realisation

2018

Place of realisation

Cheb

The documentation for the zoning decision has been prepared for the project for the extension of the sludge end of the wastewater treatment plant in Cheb for the energy and material recovery of sludge. The project focused on the addition of the sludge terminal technology with a dewatered sludge storage, a rotary drum dryer and rotary kilns with a waste gas treatment system. The documentation included basic layout and disposition of external relations drawings.

For more information about our solutions, please contact
Ing. Tomáš Krejčí
Contact
No items found.