The documentation for the project for the modernisation of the hazardous waste incinerator with the aim of increasing the processing capacity was prepared for the issuance of a zoning permit. The project envisaged the location of the new incinerator technology in the current hall after its basic reconstruction. An essential part of this is the extension of the paved areas and the shed of the hall.