During the installation of 4D filtration at the hazardous waste incineration plant, a flue gas - air cooler was designed and delivered. The heated air is distributed through the pipes by means of a fan and subsequently used to maintain thermal comfort in the incinerator hall.
The delivery was turnkey and included testing, commissioning, trial operation, operator training and a warranty test.